Apex, formerly called Apex Industrial Movers, did a report for the manufacturer of the turbines, Mr. Brise confirmed. the contractor, Voith Hydro Inc., hasn’t “let the contract on transport of the turbines.” ( it's a single source contract) https://canadiansailings.ca/big-stuff-yet-to-come-at-b-c-s-site-c-dam-megaproject/
You can follow @lulex.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled:

By continuing to use the site, you are consenting to the use of cookies as explained in our Cookie Policy to improve your experience.