It is the latest in a series of huge storage projects, including a 4 hour, 700MW battery by Origin Energy, a $500 million pumped hydro project proposed by ATCO, and battery proposals by AGL Energy, Maoneng and TransGrid, not to mention the Snowy 2.0 pumped hydro mega project.
There goes the need for the governments gas fired power plant at Kurri Kurri. If it is built it will very swiftly become a stranded asset ie useless and worthless
#auspol
You can follow @barobertson111.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled:

By continuing to use the site, you are consenting to the use of cookies as explained in our Cookie Policy to improve your experience.