600 cubic metres of concrete needed for every “green” wind turbine. This concrete is never removed.

Green things are never as green as they seem.
The manufacture of concrete is responsible for the production of almost 10% of the world’s CO2.

Just ask who profits from carbon tax.
Then stop believing their lies.
THEY’ve been lying to us for decades. https://www.bbc.com/news/science-environment-46455844
I lost 1,000 followers in the past 4 weeks due to the conservative twitter purge. I do follow back. I’m sure it would annoy Jack if I hit 5,000 again...
💪🏼🇬🇧🇮🇱🇺🇸🏴󠁧󠁢󠁥󠁮󠁧󠁿🇦🇺
We need over 2,000 wind turbines to produce as much energy as an average size nuclear power plant.

And when compared with some of the larger ones being built, they equate to over 10,000 wind turbines. This would need over 2,000 square kilometres - or land larger than London, UK.
A modern nuclear power plant produces the same energy as 10,000 industrial scale wind turbines.

The wind farm needed for these would be 40 times the size of Manhattan and would require 6 million cubic metres of concrete - just for the turbine bases!

Green? 😂
You can follow @PoliticsBloke.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled:

By continuing to use the site, you are consenting to the use of cookies as explained in our Cookie Policy to improve your experience.