TEAMSTERS ORGANIZING:
https://www.facebook.com/shane.thompsom.12

This is not left or right, but merely facts.

The Keystone Pipeline was being built to ship shale oil from Canada to The Gulf Of Mexico to be shipped to China.
Shale oil is the sludge of the oil commodities market.

American refineries do not want to process, and refine it when there is brent crude available.
Building the pipeline will take 2,000 workers two years to build. After that, there will be 35 permanent jobs manning the pumping stations, and checking for, and repairing leaks.
That oil is already being shipped.

How?

Truckers, and railroad workers, keeping them employed, along with the truck stop workers, mechanics, motel workers, restaurant workers, filling station workers, etc. who man the trucking networks.
The pipeline would cut out thousands of truck drivers and other permanent workers.

The pipeline crosses the largest aquifer in the United States.
The pipeline serves one purpose.

It will increase profits for the oil companies.
It will eliminate thousands of jobs, but it's being framed as pro-worker. Think about it critically.

It's a corporate lie.
You can follow @BlisterPearl.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled:

By continuing to use the site, you are consenting to the use of cookies as explained in our Cookie Policy to improve your experience.