Effective snow-clearance will remain improbable till SMC is equipped with adequate, modern snow-clearing machines.

The tradition is to make-do with JCBs and loaders - which aren’t meant for snow-clearance.

SMC has less than 20 JCBs/loaders. Srinagar has 7,500+ lanes!

1/n
Around a year or more ago - the SMC F&P Committee had approved my proposal for the procurement of 25 4x4 snow-clearance machines.

Funds have been available since.

For some strange reason, the procurements weren’t made. I will ensure these crucial vehicles are procured.

2/n
Images of snow being cleared with spades, shovels and JCBs should be an embarrassment. To me - it surely is.

We need to cut the red-tape to ensure speedy vital procurements and development.

Our grievance redressal mechanisms/equipments are either absent or outdated.

3/n
SMC is unable to do a perfect job of clearing 7,500+ lanes with spades and two dozen garbage lifting loaders/JCBs.

We inherited an SMC with nothing beyond brooms & handcarts. We scaled up, upgraded our machines during COVID and I assure you we will continue to do so now.

4/n
I will ensure all codal formalities for the procurement of the required equipment and machines is initiated transparently and without delay.

With lack of machines and inadequate manpower - I express my gratitude to all SMC field staff for putting in their 100%.

5/5
You can follow @Junaid_Mattu.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled:

By continuing to use the site, you are consenting to the use of cookies as explained in our Cookie Policy to improve your experience.