4)
The data center is able to process "all forms of communication, including the complete contents of private emails, cell phone calls, and Internet searches, as well as all types of personal data trails-parking receipts, travel itineraries, bookstore purchases, and other
5)
digital 'pocket litter’."

In response to claims that the data center would be used to illegally monitor email of U.S. citizens, in April 2013 an NSA spokesperson said, "Many unfounded allegations have been made about the planned activities of the Utah Data Center, ...
6)
one of the biggest misconceptions about NSA is that we are unlawfully listening in on, or reading emails of, U.S. citizens. This is simply not the case.” This statement was made two months prior to the document leak that revealed the existence of the PRISM program.
7)
Some members of the public question the credibility of official statements like Bamford's in light of the revelations made in the two months following his statement.
Utah Data Center
8)
In April 2009, officials at the United States Department of Justice acknowledged that the NSA had engaged in large-scale overcollection of domestic communications in excess of the United States Foreign Intelligence Surveillance Court's authority, but claimed that the acts
9)
were unintentional and had since been rectified.

In August 2012, The New York Times published short documentaries by independent filmmakers titled The Program, based on interviews with former NSA technical director and whistleblower William Binney.
10)
The project had been designed for foreign signals intelligence (SIGINT) collection, but Binney alleged that after the September 11 terrorist attacks, controls that limited unintentional collection of data pertaining to U.S. citizens were removed, prompting concerns by him and
11)
others that the actions were illegal and unconstitutional. Binney alleged that the Bluffdale facility was designed to store a broad range of domestic communications for data mining without warrants.
12)
Documents leaked to the media in June 2013 described PRISM, a national security computer and network surveillance program operated by the NSA, as enabling in-depth surveillance on live Internet communications and stored information.
13)
Reports linked the data center to the NSA's controversial expansion of activities, which store extremely large amounts of data. Privacy and civil liberties advocates raised concerns about the unique capabilities that such a facility would give to intelligence agencies.
14)
"They park stuff in storage in the hopes that they will eventually have time to get to it," said James Lewis, a cyberexpert at the Center for Strategic and International Studies, "or that they'll find something that they need to go back and look for in the masses of data."
15)
But, he added, "most of it sits and is never looked at by anyone."

😂LOLz 😂

The UDC was expected to store Internet data, as well as telephone records from the controversial NSA telephone call database, MAINWAY, when it opened in 2013.
16)
In light of the controversy over the NSA's involvement in the practice of mass surveillance in the United States, and prompted by the 2013 mass surveillance disclosures by ex-NSA contractor Edward Snowden, the Utah Data Center was hailed by The Wall Street Journal as
17)
a "symbol of the spy agency's surveillance prowess".

Binney has said that the facility was built to store recordings and other content of communications, not only for metadata.
18)
According to an interview with Snowden, the project was initially known as the Massive Data Repository within NSA, but was renamed to Mission Data Repository due to the former sounding too "creepy".
19)
The planned structure provides 1 to 1.5 million square feet (90,000–140,000 m2), with 100,000 square feet (9,000 m2) of data center space and more than 900,000 square feet (84,000 m2) of technical support and administrative space. It is projected to cost $1.5–2 billion.
20)
A report suggested that it will cost another $2 billion for hardware, software, and maintenance. The completed facility is expected to require 65 megawatts of electricity, costing about $40 million per year.
21)
The facility is expected to use 1.7 million gallons (6,435 m3) of water per day.[25] An article by Forbes estimates the storage capacity as between 3 and 12 exabytes in the near term, based on analysis of unclassified blueprints, but mentions Moore's Law, meaning that
22)
advances in technology could be expected to increase the capacity by orders of magnitude in the coming years.

Toward the end of the project's construction it was plagued by electrical problems in the form of "massive power surges” that damaged equipment.
23)
This delayed its opening by a year.

The finished structure is characterized as a Tier III Data Center, with over a million square-foot facility, that cost over 1.5 Billion dollars to build. Of the million square-feet, 100,000 square feet is dedicated to the data center.
24)
The other 900,0000 square-feet is utilized as technical support and administrative space.

https://en.wikipedia.org/wiki/Utah_Data_Center
You can follow @JohnD_ohh.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled:

By continuing to use the site, you are consenting to the use of cookies as explained in our Cookie Policy to improve your experience.