GRL - Good update

GRL is therefore confident, based on its extensive experience & the substantial increase in mineable resource determined by the programme, that the Homase South Pit can be significantly extended at depth & mined economically. 

1 https://twitter.com/aimrns/status/1326782362517172224
#GRL
increase mineable resource by 86,900oz, a 257% increase

confirm potential to expand the Homase South Pit at depth

Co plans to update DEP & mine plan, to substantially increase the production output & processing rates for Homase South Pit based on above

2
#GRL CEO

Very pleased with results from drilling prog which increased mineable resource by 250% & gives potential to expand pit to depth of 80m.  The results from drillholes exceed our expectations of extent of near-surface mineralisation & confirms the grade increasing at depth
#GRL We continue to liaise closely with the EPA regarding issue of Environmental Permit & with Minerals Commission on operational permits

Upon receipt of permits, Co in a position to immediately commence operations, with estimated timeline for 1st gold pour within 2 months

4
You can follow @JohnM_AIM.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled:

By continuing to use the site, you are consenting to the use of cookies as explained in our Cookie Policy to improve your experience.