#ThreadUpdate

Presidential Power Initiative deal with the German Government and @Siemens_Energy

1st phase Implementation Breakdown in Graphics.

@NigeriaGov
@EngrSMamman
@GarShehu
@toluogunlesi
@BashirAhmaad
@AjuriNgelale
@SiemensNG
Rational behind the selection of these Projects.
Rational Continued.
Presidential Power Initiative Distribution Projects as proposed by the DisCos.
Presidential Power Initiative Transmission Projects as Proposed by @TCN_NIGERIA
Capacity Building for Power Sector Workers through the Presidential Power Initiative deal to be conducted by @Siemens_Energy and @SiemensNG
Transmission Line Projects as Proposed by @TCN_NIGERIA
Project Execution structure showing the role of Siemens and Local Engineering Firms.
Types of Engineering works available for Local Indigenous Engineering Firms.
Distribution Projects as proposed by the DisCos for Phase 1 implementation of the Presidential Power Initiative deal.
Substations and Transformers.
Thousands of Kilometres of Distribution Infrastructure to be built in various areas across the Country.
Substation Projects as Proposed by DisCos.
You can follow @PowerMinNigeria.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled:

By continuing to use the site, you are consenting to the use of cookies as explained in our Cookie Policy to improve your experience.