Making up a list of uranium miners with estimated time to production and at what cost
Exclude all names currently producing like $CCJ $KAP $UUUU $URG $PEN
Here is my current list (favourites)
$PDN ~12months to production at a cost of $78m for a production capacity of 8mlbs pa
Exclude all names currently producing like $CCJ $KAP $UUUU $URG $PEN
Here is my current list (favourites)
$PDN ~12months to production at a cost of $78m for a production capacity of 8mlbs pa
$BOE 9-12months. cost? Assume low as already $170m of established infrastructure. Production: 880mlbs 1st year, 2mlbs year 2nd year, 3.3mlbs 4th year.
$GLO Final feasibility study die 2021 earliest production probably ~12months? Advantage of development funded by zinc business
$GLO Final feasibility study die 2021 earliest production probably ~12months? Advantage of development funded by zinc business
$LAM 12-18mths as has all permits for US ISR mines. Cost $30m with aim of 1mlbs pa.
$VMY claims mine ready in 2020?
Who am I missing or what of the above have I got wrong?
@quakes99 @uraniuminsider @timothychilleri @tsizzle84 @FissionMan1
$VMY claims mine ready in 2020?
Who am I missing or what of the above have I got wrong?
@quakes99 @uraniuminsider @timothychilleri @tsizzle84 @FissionMan1