Hi I’m Christopher Ezengwa. Got a contract and I want you work with you guys through from start to finish
Hi I’m Christopher Ezengwa. Got a contract and I want you work with you guys through from start to finish


Well for starters ..
Client - well don’t know if they’d want their name out there so let’s just call them ‘Axis Bank’
Building type - commercial
Site location - Adavi LGA | Kogi State
Estimated duration - 12 weeks
Client - well don’t know if they’d want their name out there so let’s just call them ‘Axis Bank’
Building type - commercial
Site location - Adavi LGA | Kogi State
Estimated duration - 12 weeks
KNOW YOUR LEVEL
Made you stop to read yh? Well for starters what you need to know is that what ever site you’re working on you need to start out from knowing your site levels.
Head and tail your site has to be higher than the road .. so it can slop to the road gutters
Made you stop to read yh? Well for starters what you need to know is that what ever site you’re working on you need to start out from knowing your site levels.
Head and tail your site has to be higher than the road .. so it can slop to the road gutters
Site condition is mad interesting, it’s mad lower than the road, a bit water logged. I mean there’s a well on site that’s full (this is dry season up north)
The height of the road at this point is 1m .. it gets lower ..mad crazy yh?
The height of the road at this point is 1m .. it gets lower ..mad crazy yh?
Filling done, next Level foundation works
Initial ring beams of 600mm depth
Over dpm
Over 50mm concrete blinding
Initial ring beams of 600mm depth
Over dpm
Over 50mm concrete blinding
Supply of containers to site *rubs hands*
Container placement on casted 250mm raft
Damn .. left this thread for so long .. here goes Internal works after container positioning
Application of thermal insulation.
Mechanical and electrical services
Damp proofing
Application of thermal insulation.
Mechanical and electrical services
Damp proofing
Progress
Work progress .. stamped concrete, potty filling and painting (main building and ATM) polishing of stamp concrete next
Facade walk through

Side view .. twitter will kill the quality but here still